ProjectAtyrau CHP Plant JSC
Supply and installation of equipment: protection panels, feed pump panels, control consoles, RTZO panels.
Turnkey electrical equipment and installation from 0.4 to 500 kV: from automation panels to substation construction.









maximum voltage class
own products
turnkey service areas
projects in our portfolio


We build, install and commission power facilities with our own crews. Here is the essentials; details are inside each service.
All services
10–500 kVPower line construction means laying transmission lines, including in the most remote and hard-to-reach areas. To ensure reliable, trouble-free operation and therefore uninterrupted power supply to residential …
We install power stations and transformer substations, transformers from 1,600 to 63,000 kVA, SF6 circuit breakers, disconnectors and surge arresters. Our company completes installation work quickly without com…
We provide a full range of special works: 1) routine and major repairs; 2) reconstruction and modernisation of equipment at any power facility. We carry out comprehensive measures to fully or partly restore the…
Electrical installation works. We design power supply projects, obtain their approval and the certificate of admission. We carry out operational tests of electrical equipment and cable networks and hand over electrical…
We manufacture:
We manufacture:
One dedicated manager at every stage, from the first call to the signing of the acceptance certificate.
We discuss the task and collect the input data.
We choose the solution and prepare the quote and timeline.
We build and test in our own workshop.
We install, start up and hand over the facility.
ProjectSupply and installation of equipment: protection panels, feed pump panels, control consoles, RTZO panels.
ProjectIntegrated APCS control panels and RT30 panels.
ProjectConstruction of a 210 MW gas turbine power plant in Taraz, Zhambyl region
ProjectKyzylorda region, Shieli district, Shieli settlement, Enbekshi village, Bala-Sauyskandyk deposit
ProjectAlmaty International Airport opened in 1935 and is today the largest airport in Kazakhstan; it is an out-of-class airport able to receive aircraft of any type.
ProjectThe Arctic plant produces drinking water and soft drinks. It belongs to InterBeer, part of Eldorado, the largest holding company in the Republic of Kazakhstan.
ProjectThe residential complex is located in the south-west of Almaty, below Al-Farabi Avenue, between Rozybakiev Street and the Bolshaya Almatinka river embankment. It consists of ten 25-storey buildings and was commissioned in 2014.
ProjectMaxima is a modern multifunctional shopping and entertainment complex with an area of 35,000 square metres.
Leave your phone number and an engineer will call you back, clarify the task and prepare a quote, usually within one business day.
An engineer will call you back to clarify the details.